August 15, 2023

Launching the report remotely – Docs for ESB 6.x

Launching the report remotely

  1. From the
    Profiling
    perspective, right-click the
    ColumnAnalysis_WithThresholds report under the
    Report node and select Generate Jobs > Launch a report from the
    contextual menu.

    This generates a launch-report Job and opens it in the
    Integration

    perspective.
    use_case-tdqreportrun3.png

    The Report filenames field points to the
    technical path of the report, and the Output
    Folder
    field points to the folder where to save the report
    file.
  2. Press F6 to execute the Job from the Studio
    for testing purposes.

    If any modifications are done in the analysis after you generate the Job from
    the analysis report, you must click the Refresh
    Dependency
    tab in the basic settings of tDqReportRun before you execute the Job.
  3. Connect to the
    Talend Administration Center
    Web application.
  4. In the menu tree view of the Web application, expand Conductor and click Job
    Conductor
    to display the execution task list.

    use_case-tdqreportrun4.png

    The Job Conductor page gathers the script
    generation, Job deployment and Job execution phases.
  5. From the toolbar on the Job Conductor page,
    click Add > Normal Task to clear the Execution
    task
    configuration panel.

    use_case-tdqreportrun5.png

    On this configuration panel, set the parameters required for executing the
    launch-report Job as the following:
    • In the Label field, type in the
      task name.

    • In the Project field, select the
      project in which the launch-report Job was created.

    • In the Branch field, select
      trunk as the branch of this
      project.

    • From the Name list, select the
      launch-report Job to be used.

    • In the Version list, select the
      Job version you want to launch; and in the Context field, select the context in which to run
      the Job.

    • From the Execution server list,
      select the server which you want to use to execute this task you are
      configuring.

  6. Click Save to validate the configuration
    of this execution task.

    The new task is displayed in the Job
    Conductor
    page under the corresponding project.
  7. From the task list, select the newly added task.
  8. On the toolbar of the Job Conductor page,
    click Generate.
  9. Once the status of this task reads Ready to send on
    the task list, select the task again and click Deploy on the toolbar.
  10. Once the status of this task reads Ready to run on
    the task list, select the task again and click Run on the toolbar.

    When you run the launch-report Job from
    Talend Administration Center
    Web
    Application, the analysis listed in the report is executed. The analysis results
    are saved in the report database and the report file is saved in the output
    folder defined in the tDqReportRun basic
    settings.

Document get from Talend https://help.talend.com
Thank you for watching.
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x