August 16, 2023

Verification status – Docs for ESB 6.x

Verification status

The verification status can be one of the followings:

Status

Description

V (Verified)

the address was parsed and an exact match in the reference
data was found for all the address components.

P (Partially Verified)

the reference data has more detail than the input data for
the address. The address was parsed and most of the components of the
address were matched against the reference data.

U (Unverified)

the input data could not be parsed. The output fields will
contain the input data.

A (Ambiguous)

more than one item in the reference data match the input
data.

C (Conflict)

individual address components are valid, but the address is
not valid when combining the components together.

R (Reverted)

the address was parsed and verified but a minimum
acceptable level of verification was not reached. The output fields will
contain the input data.


Document get from Talend https://help.talend.com
Thank you for watching.
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x