24 Hours Time Dimension Load Job – Talend Data Integration Job

24 Hours Time Dimension Load Job
Name: 24 Hours Time Dimension Load Job
Icon: 24 Hours Time Dimension Load Job
Author: umeshrakhe
Resources:
Download:
Install Instructions:
Example: Coming soon…
Features:
Overview:

24 hour time dimension to use for date queries that look at minutes, hours, seconds, time, etc. using Talend 5.4.

This Job Developed in TOS 5.4

Thanks
Umesh Rakhe

Release Notes:

Release version: 1.0 – 2014-05-21 08:42:43
%2024%20hour%20time%20dimension%20to%20use%20for%20date%20queries%20that%20look%20at%20minutes,%20hours,%20seconds,%20time,%20etc.%20%20using%20Talend%205.4.%20/n/r/n/rThis%20Job%20Developed%20in%20TOS%205.4/n/r/n/r/n/rThanks,/n/rUmesh%20Rakhe

Compatible:
  • 1.1 (obsolete)
  • 2.1 (obsolete)
  • 2.2 (obsolete)
  • 2.3 (obsolete)
  • 2.4 (obsolete)
  • 3.0 (obsolete)
  • 3.1 (obsolete)
  • 3.2 (obsolete)
  • 4.0 (obsolete)
  • 4.1 (obsolete)
  • 4.2 (obsolete)
  • 5.0 (obsolete)
  • 5.1 (obsolete)
  • 5.2 (obsolete)
  • 5.3 (obsolete)
  • 5.4 (obsolete)
  • 6.0 (obsolete)
  • 6.1 (obsolete)
  • 6.2 (obsolete)

Document get from Talend Exchange
Thank you for watching.

Was this article helpful?
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x